From e4855226b5a5b4ae6a1fa263bb92109a33bd43cb Mon Sep 17 00:00:00 2001 From: Maxim Kuvyrkov Date: Tue, 2 May 2017 09:18:02 +0000 Subject: tcwg-*: Switch all matrix and multijob jobs to tcwg-coordinator This change makes all TCWG matrix and multijob "coordination" jobs to run on tcwg-coordinator label. The "coordination" jobs do not consume significant resources and just wait for other jobs to finish. In case of matrix jobs these are "flyweight" jobs, and all TCWG multijobs behave similarly. Another benefit from this change is that git checkouts for "coordination" jobs will no longer be mixed with workspaces of matrix sub-builds of the same jobs, if sub-builds happen to start on the same node as coordination job. This has been auto-generated with the following script $ cat > tcwg-coordinator.sh <