aboutsummaryrefslogtreecommitdiff
path: root/linux-linaro-stable-lsk-v3.14-pre-merge
AgeCommit message (Collapse)Author
2015-05-26linux-linaro-stable-lsk-*: fix vexpress-tc2 boot_cmdsChase Qi
UEFI firmware using on vexpress-tc2 updated from "version built at 09:29:10 on Apr 17 2014” to "version built at 18:05:20 on May 22 2014”. Boot configure menu changed. Change-Id: I86db64aa9070ac0467401574461ba857249f53ce Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-04-22lnux-linaro-stable-lsk-*: increase mmtests timeout to 7200Chase Qi
3600 seconds is not enough after vmscal and timedalloc added to mmtests test case. Increase it to 7200 seconds to solve the timeout issue in lava on slower boards, like TC2 and BBB. Change-Id: Icd2df3a325c7b0765ed3043cbf5b7b02fd0da0cc Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-04-13linux-linaro-stable-lsk-v3.14: add alldebug-kernel test to vexpresss-tc2Chase Qi
Can be merged only after debug options enabled in vexpress build. Change-Id: I31150ea0fe3469169d8bb482a7364d811b212ffc Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-04-08linux-linaro-stable-lsk-*: armv7a: set libhugetlbfs test WORD_SIZE to 32Chase Qi
The default WORD_SIZE parameter is set to 64, setting it to 32 to make it work on armv7a rootfs. Change-Id: Ia31a781dd9198bb87c1bb18a58be1673e3ad7041 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-04-02rtsm_fvp_base-aemv8a: increase perf test timeoutChase Qi
The current 800 seconds is a little bit tight, sometimes not enough. Increasing to 1800 seconds to solve occasional test timed out issue. Change-Id: Icff50f3e71027405bbaafb07eeb806aaeeace902 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-03-13linux-linaro*: add usb-test-basic to test planChase Qi
Created dedicated usb-test-basic test case. Need to add it to test plan before remove lsusb test from smoke-test-basic. Change-Id: If808b3ae29cb5cc4684d06cdda76dbb82a62c450 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-03-05linux-linaro-stable-lsk*: TC2: optimize test planChase Qi
1) Align with lsk-v3.10, split lsk-v3.14 ltp tests 2) Move ltp tests to the bottom 3) Move IKS tests on lsk-3.10 to the bottom Change-Id: I3ecdf5100a003195ec5ab872f61d41c830ad69f3 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2015-02-27LTP: skipfile path fixupNaresh Kamboju
LTP skipfile path fixed. with the current path LAVA jobs failed. Change-Id: I56a145efab74892004fe6e4252e330905f9a38bd Signed-off-by: Naresh Kamboju <naresh.kamboju@linaro.org>
2015-01-18linux-linaro-stable-lsk-v3.14: submit LAVA job for MustangFathi Boudra
Change-Id: Ic744053fbf61a6e9d9a7890cbee56cdee514b561 Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2015-01-17linux-linaro-stable-lsk-v3.14: add beaglebone blackFathi Boudra
Change-Id: Ie92d62d763460962237ee0cd11a78542519e3231 Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2015-01-17linux-linaro-stable-lsk*: juno: remove boot_linaro_image stanzasFathi Boudra
Change-Id: Iab39278eef1abc5487a633821f15b36aa0f5490f Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2014-12-24linux-linaro-stable-lsk-v3.14-pre-merge: add initial jobFathi Boudra
Change-Id: I5a2e2fae24dc85fccd98fd432cb1b6c7dfb345cf Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2014-12-19linux-linaro-stable-lsk*: reduce libhugetlbfs test timeout to 7200Chase Qi
rtsm_fvp_base-aemv8a takes 45 minutes and juno only take 10 minutes to finish libhugetlbfs test, reduce the timeout from 18000 to 7200, it doesn't need that long time. Change-Id: Id571cec54d7fa8705bfa2450590deb9ca9dad7b0 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2014-12-19linux-linaro-stable-lsk*: add ltp-syscalls and libhugetlbfs to juno template-efiChase Qi
Change-Id: If0a382bb866e4fd0a4b66483cf751f2e41aad069 Signed-off-by: Chase Qi <chase.qi@linaro.org>
2014-12-17linux-linaro-stable-lsk: update boot_cmds for Juno firmware 0.8.1Fathi Boudra
Change-Id: Iada6dae11b0c048b17ac559b9bb08bda3a659b1a Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2014-12-10linux-linaro-stable-lsk*: support EFI stub for the 32bit rootfsFathi Boudra
Change-Id: I10608290b1c3da817037326a7c4bc97586161564 Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2014-12-08linux-linaro-stable-lsk*: unify Juno templatesMilosz Wasilewski
In order to prevent data loss on failed LTP (timeouts) the test was split to run separate packges. Skipfile was added to parameters. Templates for all jobs were unified. Long running tests are omited in FVP model template (LTP syscalls and libhugetlbfs). Change-Id: I1ebcae820a0acfa71b73b87333e43be251543e14 Signed-off-by: Milosz Wasilewski <milosz.wasilewski@linaro.org>
2014-10-27rename wg device type to junoFathi Boudra
Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>
2014-09-13linux-linaro-stable-lsk: add lava job definitions templatesFathi Boudra
Signed-off-by: Fathi Boudra <fathi.boudra@linaro.org>